Design Of Transport Infrastructure
Design of
Panvel bypass - part of Mumbai Pune Expressway
Mr. Amol Khair was Team Leader for undertaking the Engineering
Surveys for the Panvel bypass, which is about 11 km long.
The deign of the Panvel bypass was entrusted to M/S. Technogem
Consultants, and the assignment of Highway engineer was
undertaken in association with Technogem Consultants.
Design
of fly over at Love Grove intersection & Cloverleaf
Interchange at Mahim junction as part of Bandra- Worli
Sea - Link project for Severdrup Civil Inc.
The
design of horizontal/ and vertical alignment for the Love
groove flyover under this project was undertaken.
The first three legged cloverleaf interchanges was designed
for
the project at Mahim. The design of horizontal Vertical
profile was responsibility of Shri. Amol S. Khair as
highway
Engineer.
Preliminary
design and cost estimates for Bangalore - Mysore Expressway
The design
of highway alignments, interchanges and the toll plaza
along with the preparation of preliminary
cost estimation
was undertaken by Shri. Amol S. Khair in association
with Clique Consultants, Mumbai for Nandi Infrastructure
Corridor
projects, Bangalore.
Design and
cost estimates for the widening and strengthening of Satara-Patan
hill
road 65 km long
Shri. Amol
Khair was Team leader for the survey, design & cost-estimation
of 5.5 m wide hill road passing through Sahyadri
ranges. The work involved Engineering surveys, land acquisition
surveys,
and preparation of BOQ and preparation of tender
document for the project.
Pavement
Evaluation Studies for Pimari-Chinchwad Municipal Corporation
Shri. Amol
Khair has undertaken the Pavement Evaluation for the 12
major roads in P.C.M.C
area. The study
involved axle
load surveys, pavement deflection surveys,
In- situ CBR surveys and the design of pavements
on the basis
of the
surveys results.
The recommendations for the Pavement overlays,
Capacity augmentation, quality control procedures
to be adopted
etc. were part of
the study.
Engineering
and Land acquisition Surveys for the Satara- Kolhapur Section
of NH-4
Shri. Amol
Khair was Team Leader and undertook the engineering Surveys,
geo-technical
investigations and preparation
of Land acquisitions proposals of above-mentioned
section of NH-4. The section has been
considered as the part
of
the
Golden Quadrangle Project. The section
was 24 Km long.
Earthquake
Rehabilitation and Reconstruction for 6 towns in Kutch
The work of
infrastructure design and Supervision was entrusted to
Tata Consulting
Engineers
by Gujarat Urban
Development
Corporation. Asian Development Bank
is funding the project. Mr. Amol
Khair is
a team member
in the professional
team,
and key specialist working as Senior
Transportation/ Highway Engineer.
Integrated
road Development Programme for Nandurbar City
The integrated
road development programme for Nandurbar City has
been undertaken
by Maharashtra
State Road
Development Corporation. The
design consultancy of the road improvement
was entrusted to Technogem Consultants
Pvt. Ltd. Thane. The
job of Engineering surveys and
Pavement investigation works
for about 25
Km of
roads in the Nandurbar
City were entrusted
to AAKAR Enterprises. Mr. Amol
S. Khair has worked as a Team
leader for this
survey team.
The Plans,
L- sections,
cross-
sections of these roads have
been prepared and under submission
to Technogem Consultants.
Integrated
road Development Programme for Sholapur City
The integrated
road development programme for Sholapur City
has been undertaken
by Maharashtra
State Road
Development Corporation.
The design consultancy of the road
improvement
was entrusted to AAKAR Enterprises,
Navi-
Mumbai. The job of Engineering
surveys, Pavement investigations,
preparation
of road widening proposals,
cost estimates, preparation
of
bid documents for the road
improvement programme has
been undertaken by AAKAR
Enterprises for about 24 Km of road
in the Solapur City. The
road includes about 4 roads in Solapur
Municipal limits and four
roads of
State PWD, Maharashtra. Amol
S.
Khair is a
team leader
for this survey
and engineering design team.
The Plans, L- sections, cross-
sections
of these roads are under
preparation.
Planning,
designing and cost estimates for
Thane-Belapur
road
for Navi Mumbai
Municipal Corporation
The widening
and strengthening of Thane Belapur road was
envisaged under Aside
scheme. AAKAR
ABHINAV Consultants
were appointed by Navi
Mumbai Municipal Corporation
for
all the
pre-tender activities.
As part of
the assignment, following
activities were
undertaken by
Consultants.
-
Preparation
of project report for Thane –Belapur
road for Aside
scheme and approval to the same.
-
Preparation
of Detailed Project
report with detailed
cost estimates,
drawings
and designs
etc.
-
Pre-qualification
of agencies
for execution of
the project.
-
Preparation
of Invitation
of tenders
for Packages
1, 2 & 3
of Thane
Belapur Road.
-
Preparation
of Invitation
of Bid
for appointment
of Project
Management
Consultants.
-
Assistance
to NMMC
for appointment
of
Project
management
Consultants
and Contractors.
The project
has reached
to a
stage
where
in bids
have
been
invited
for the
project
and
NMMC
is
finalizing
the
appointment
of Agency.
Other projects
of Design of transport infrastructure
-
Design
of toll plaza and pedestrian and parking facilities on
LBS
road near Mulund Check Naka for MSRDC.
-
Infrastructure
design and Super vision Consultancy for the Earthquake
affected towns in Kutch district
of Gujarat,
in association with Tata Consulting Engineers for
Gujarat Urban Development Corporation.
-
Topographic
survey and Engineering design Hotagi road from 3/00 km
to 21/00 km in Solapur for
Mehul Construction
Co.
-
Engineering
survey, design and cost estimates for Kashil-Pal-Tarale-Jalav
road - MDR-71 for
MSRDC.
-
Engineering
survey, design & cost estimates for 8
km long NH-17 bypass near Kanakona Goa.
-
Engineering
survey, design & cost estimates for 30km
of Coastal Goa Roads.
-
Design
of Toll plaza at Mulund on Eastern Express Highway for
Maharashtra State
Road Development Corporation.
-
Conceptual
layout for flyover at Nigadi Intersection on N.H.4 for
Pimpri-Chinchwad
Municipal Corporation
- In association
with Technogem Consultants.
-
Design
of Toll Plaza for Ideal road builders on Bhivandi- Wada
Road.
-
Design
of Kalamboli Intersection, Wavanje Interchange and Shedung
intersection on
Panvel Bypass for Technogem
Consultants.
-
Intersection
Designs, Toll Plaza design for Shirdi Bypass
for Technogem
Consultants.
-
Design
of Toll Plaza for Ideal Road Builders for Kaman
Pygaon
Project.
-
Cost
estimates for 51 Km. of Nashik - Aurangabad State
Highway
No. 30 for
Backbone Projects.
-
Standardisation
of 2/4/6 Lane toll plazas for MSRDC.
-
Concrete
Road repair works in Mahananda Dairy
Goregaon,
Mumbai.
-
Pre-feasibility
study for 4/6 laning of Shil
- Mahape
road for
MIDC for
Suncon Engineers,
Pune.
|
|
Design
of Toll Plaza at Khambatki |
Design
of Toll Cabin for Dahisar Toll Plaza |
-
Design
of Toll Plaza for Ideal Road
Builders
for four
laning of
Khambatki Ghat section
of NH-4.
-
Design
of Toll Plaza and Intersections
on
Mumbra Bypass
for Technogem
Consultants.
-
Planning & Design
of roads in Amby Vally Project of Sahara Group for
Shrikhande Consultants.
-
Design
of toll plaza
at Vashi
on Sion - Panvel
Expressway
for
MSRDC.
-
Design
of intersections,
vehicular
and pedestrian
underpasses,
toll
plaza, Road
Signage and
paint
marking Scheme
for NH4 section
from
616 Km.
to 639 Km.
for Technogem
Consultants.
-
Design
of toll
plaza on
NH8 -
Delhi -
Jaipur Highway near
Km. 60.85
for
Sir Owen
Willams
India Ltd
/ NHAI.
-
Block
cost
estimates for
four
laning of old
NH4 from
131/200
to
20/400
for MSRDC
in
Association
with
STB Consultants.
-
Traffic
study
and
Preliminary cost
estimates
for
6/8 laning
of
Thane- Belapur
road
for
MIDC/NMMC in Joint
venture
with
Suncon
Engineers.
-
Widening
of
Port
roads
and
Preparation
of
traffic
management
schemes
for
Jawaharlal
Nehru
Port
Trust.
|
|
Design
of Kalamboli Intersection part of Panvel Bypass
|
-
Design for
7.0 km
long Mangalwedha
- bypass.
-
Design for
Andheri- Ghatkopar
link road
- 4
km.
-
Preliminary cost
estimates for
Jalendhar-Amritsar road
(about 50km)
for HCC.
-
Preliminary cost
estimates for
Nagar-Aurangabad Road
for Suyojit
Build Tech.
-
Preliminary cost
estimates for
Ahmednagar- Kopargaon
road for
Suyojit Build
Tech.
|