Design Of Transport Infrastructure

Design of Panvel bypass - part of Mumbai Pune Expressway

Mr. Amol Khair was Team Leader for undertaking the Engineering Surveys for the Panvel bypass, which is about 11 km long. The deign of the Panvel bypass was entrusted to M/S. Technogem Consultants, and the assignment of Highway engineer was undertaken in association with Technogem Consultants.

Design of fly over at Love Grove intersection & Cloverleaf Interchange at Mahim junction as part of Bandra- Worli Sea - Link project for Severdrup Civil Inc.

The design of horizontal/ and vertical alignment for the Love groove flyover under this project was undertaken. The first three legged cloverleaf interchanges was designed for the project at Mahim. The design of horizontal Vertical profile was responsibility of Shri. Amol S. Khair as highway Engineer.

Preliminary design and cost estimates for Bangalore - Mysore Expressway

The design of highway alignments, interchanges and the toll plaza along with the preparation of preliminary cost estimation was undertaken by Shri. Amol S. Khair in association with Clique Consultants, Mumbai for Nandi Infrastructure Corridor projects, Bangalore.

Design and cost estimates for the widening and strengthening of Satara-Patan hill road 65 km long

Shri. Amol Khair was Team leader for the survey, design & cost-estimation of 5.5 m wide hill road passing through Sahyadri ranges. The work involved Engineering surveys, land acquisition surveys, and preparation of BOQ and preparation of tender document for the project.

Pavement Evaluation Studies for Pimari-Chinchwad Municipal Corporation

Shri. Amol Khair has undertaken the Pavement Evaluation for the 12 major roads in P.C.M.C area. The study involved axle load surveys, pavement deflection surveys, In- situ CBR surveys and the design of pavements on the basis of the surveys results. The recommendations for the Pavement overlays, Capacity augmentation, quality control procedures to be adopted etc. were part of the study.

Engineering and Land acquisition Surveys for the Satara- Kolhapur Section of NH-4

Shri. Amol Khair was Team Leader and undertook the engineering Surveys, geo-technical investigations and preparation of Land acquisitions proposals of above-mentioned section of NH-4. The section has been considered as the part of the Golden Quadrangle Project. The section was 24 Km long.

Earthquake Rehabilitation and Reconstruction for 6 towns in Kutch

The work of infrastructure design and Supervision was entrusted to Tata Consulting Engineers by Gujarat Urban Development Corporation. Asian Development Bank is funding the project. Mr. Amol Khair is a team member in the professional team, and key specialist working as Senior Transportation/ Highway Engineer.

Integrated road Development Programme for Nandurbar City

The integrated road development programme for Nandurbar City has been undertaken by Maharashtra State Road Development Corporation. The design consultancy of the road improvement was entrusted to Technogem Consultants Pvt. Ltd. Thane. The job of Engineering surveys and Pavement investigation works for about 25 Km of roads in the Nandurbar City were entrusted to AAKAR Enterprises. Mr. Amol S. Khair has worked as a Team leader for this survey team. The Plans, L- sections, cross- sections of these roads have been prepared and under submission to Technogem Consultants.

Integrated road Development Programme for Sholapur City

The integrated road development programme for Sholapur City has been undertaken by Maharashtra State Road Development Corporation. The design consultancy of the road improvement was entrusted to AAKAR Enterprises, Navi- Mumbai. The job of Engineering surveys, Pavement investigations, preparation of road widening proposals, cost estimates, preparation of bid documents for the road improvement programme has been undertaken by AAKAR Enterprises for about 24 Km of road in the Solapur City. The road includes about 4 roads in Solapur Municipal limits and four roads of State PWD, Maharashtra. Amol S. Khair is a team leader for this survey and engineering design team. The Plans, L- sections, cross- sections of these roads are under preparation.

Planning, designing and cost estimates for Thane-Belapur road for Navi Mumbai Municipal Corporation

The widening and strengthening of Thane Belapur road was envisaged under Aside scheme. AAKAR ABHINAV Consultants were appointed by Navi Mumbai Municipal Corporation for all the pre-tender activities. As part of the assignment, following activities were undertaken by Consultants.

  • Preparation of project report for Thane –Belapur road for Aside scheme and approval to the same.
  • Preparation of Detailed Project report with detailed cost estimates, drawings and designs etc.
  • Pre-qualification of agencies for execution of the project.
  • Preparation of Invitation of tenders for Packages 1, 2 & 3 of Thane Belapur Road.
  • Preparation of Invitation of Bid for appointment of Project Management Consultants.
  • Assistance to NMMC for appointment of Project management Consultants and Contractors.

    The project has reached to a stage where in bids have been invited for the project and NMMC is finalizing the appointment of Agency.

Other projects of Design of transport infrastructure

  • Design of toll plaza and pedestrian and parking facilities on LBS road near Mulund Check Naka for MSRDC.
  • Infrastructure design and Super vision Consultancy for the Earthquake affected towns in Kutch district of Gujarat, in association with Tata Consulting Engineers for Gujarat Urban Development Corporation.
  • Topographic survey and Engineering design Hotagi road from 3/00 km to 21/00 km in Solapur for Mehul Construction Co.
  • Engineering survey, design and cost estimates for Kashil-Pal-Tarale-Jalav road - MDR-71 for MSRDC.
  • Engineering survey, design & cost estimates for 8 km long NH-17 bypass near Kanakona Goa.
  • Engineering survey, design & cost estimates for 30km of Coastal Goa Roads.
  • Design of Toll plaza at Mulund on Eastern Express Highway for Maharashtra State Road Development Corporation.
  • Conceptual layout for flyover at Nigadi Intersection on N.H.4 for Pimpri-Chinchwad Municipal Corporation - In association with Technogem Consultants.
  • Design of Toll Plaza for Ideal road builders on Bhivandi- Wada Road.
  • Design of Kalamboli Intersection, Wavanje Interchange and Shedung intersection on Panvel Bypass for Technogem Consultants.
  • Intersection Designs, Toll Plaza design for Shirdi Bypass for Technogem Consultants.
  • Design of Toll Plaza for Ideal Road Builders for Kaman Pygaon Project.
  • Cost estimates for 51 Km. of Nashik - Aurangabad State Highway No. 30 for Backbone Projects.
  • Standardisation of 2/4/6 Lane toll plazas for MSRDC.
  • Concrete Road repair works in Mahananda Dairy Goregaon, Mumbai.
  • Pre-feasibility study for 4/6 laning of Shil - Mahape road for MIDC for Suncon Engineers, Pune.

    Design of Toll Plaza at Khambatki
    Design of Toll Cabin for Dahisar Toll Plaza

  • Design of Toll Plaza for Ideal Road Builders for four laning of Khambatki Ghat section of NH-4.
  • Design of Toll Plaza and Intersections on Mumbra Bypass for Technogem Consultants.
  • Planning & Design of roads in Amby Vally Project of Sahara Group for Shrikhande Consultants.
  • Design of toll plaza at Vashi on Sion - Panvel Expressway for MSRDC.
  • Design of intersections, vehicular and pedestrian underpasses, toll plaza, Road Signage and paint marking Scheme for NH4 section from 616 Km. to 639 Km. for Technogem Consultants.
  • Design of toll plaza on NH8 - Delhi - Jaipur Highway near Km. 60.85 for Sir Owen Willams India Ltd / NHAI.
  • Block cost estimates for four laning of old NH4 from 131/200 to 20/400 for MSRDC in Association with STB Consultants.
  • Traffic study and Preliminary cost estimates for 6/8 laning of Thane- Belapur road for MIDC/NMMC in Joint venture with Suncon Engineers.
  • Widening of Port roads and Preparation of traffic management schemes for Jawaharlal Nehru Port Trust.

    Design of Kalamboli Intersection part of Panvel Bypass


  • Design for 7.0 km long Mangalwedha - bypass.
  • Design for Andheri- Ghatkopar link road - 4 km.
  • Preliminary cost estimates for Jalendhar-Amritsar road (about 50km) for HCC.
  • Preliminary cost estimates for Nagar-Aurangabad Road for Suyojit Build Tech.
  • Preliminary cost estimates for Ahmednagar- Kopargaon road for Suyojit Build Tech.
   

 

 