|
|
 |
|
|
 |
|
|
ENGINEERING
SURVEYS:
|
Sr.
No.
|
Project Name
|
Client
|
|
1
|
Preparation of DPR
Phase-1 for Rewas Port Connectivity to NH-17 at
near Wadlhal.
|
Rewas Port Ltd (Reliance)
|
2 |
Topographic Survey and Cadastral
Survey Works for Phase-II of Strategic Storage Program
of ISPRL (INDIAN STRATEGIC PETROLEUM RESERVES LIMITED) |
Engineers India Ltd (EIL) |
ARCHITECTURAL
DESIGN:
|
Sr.
No.
|
Project Name
|
Client
|
|
1
|
Architectural consultancy
for the work of construction of Main T.E. Building
at Vikroli (East) Mumbai.
|
M.T.N.L
|
|
|

|
Main T.E. Building
at Vikroli (E)
|
|
2
|
Architectural consultancy for the work of construction
of Main T.E. Building at Andheri
|
M.T.N.L.
|
|
3
|
Architectural Design
including signage design for Metro Stations for
the corridor
Andheri to Dahisar & Charkop
to Dahisar.
|
SPAN Consultants Pvt. Ltd.
|
|
4
|
Vashi Parking
|
NMMC
|
5 |
Landscape along Palm Beach Road. |
NMMC |
6 |
Landscape & Electrical
design for water terminals. |
i-maritime Pvt. Ltd. |
TRAFFIC
AND TRANSPORTATION STUDIES:
|
Sr.
No.
|
Project Name
|
Client
|
|
1
|
Traffic Study for the proposed MRTS system in
Hinjewadi area, Pune
|
Tata Reality and Infrastructure Ltd.
|
|
2
|
Market research Surveys for the JNPT, Chennai,
Mundra and
Pipavav ports
|
CRISIL
|
TRAFFIC
IMPACT ASSESSMENT STUDIES:
|
Sr.
No.
|
Project Name
|
Client
|
|
1
|
Traffic Impact Assessment
for Proposed Residential & Commercial
Buildings at Kanjurmarg.
|
Jolly Brothers Pvt. Ltd.
|
|
2
|
Traffic Impact Assessment & Design
of Internal Roads for the Proposed Residential
Project at Binnypet,
Bangalore
|
Shapoorji Pallonji & Co.
|
|
3
|
Public Parking Demand and Traffic Impact Assessment
for Proposed Residential Building at Guffic Andheri.
|
Lodha Impression Real Estate Pvt. Ltd.
|
4 |
MEP Studies for the Preparation
of Master Plan for land parcel near Kanjur Margi. |
Ajmera Group |
PUBLIC
PARKING STUDIES:
|
Sr.
No.
|
Project Name
|
Client
|
|
1
|
Development of Public
Parking Facilities at Goregaon.
|
Skyline Construction
Co. (RNA)
|
|
2
|
Parking Demand and
Traffic Impact Assessment Report at Rafi Ahmed
Kidwai road, Sewri
|
East & West Builders
(RNA)
|
DESIGN
OF TRANSPORT INFRASTRUCTURE:
|
Sr.
No.
|
Project Name
|
Client
|
|
1
|
Feasibility study for coastal Road in NMMC area
including traffic study, preliminary topographic
surveys and block cost estimates
|
NMMC
|
|
2
|
Design of Juinagar ROB
|
NMMC
|
|
3
|
Feasibility study for Mahape interchange on Thane-
Belapur road in NMMC area including traffic study,
preliminary topographic surveys and block cost estimates
|
NMMC
|
|
4
|
Widening and improvement of MIDC internal Road
in TTC MIDC area
|
NMMC
|
|
5
|
Detailed Project Report
(DPR) for “Improvements
to Highway (SH-44) connecting Sankeshwar with Sangam
from 36.00 to 76.00 Km” in Belgaum District
|
KRDCL
|
|
6
|
Detailed Project Report
(DPR) for “Improvements
to Highway (SH-55) connecting Yaraghatti with Babaleshwar
from Ch. 54 to 79.20 in Bagalkot District and 79.20
Km to 111.80 Km in Bijapur Districts”.
|
KRDCL
|
|
7
|
Detailed Project Report for Ghatkopar-Mankhurd
Corridor.
|
MMRDA
|
8 |
Development of proposed
connectivity from the existing Airport to MRO area
in MIHAN-SEZ at Nagpur. |
MADC |
9 |
Consultancy Services
for the Project of Capacity Augmentation
of Mumbai – Pune Corridor (MPEW & NH-4) |
MSRDC |
Railway
Engineering:
|
Sr.
No.
|
Project Name
|
Client
|
|
1
|
Final location survey for the rail connectivity
for the Dighi Port across the creek
|
Balaji port/ ICONS.
|
|
2
|
Survey Alignment design, geo-technical studies,
traffic studies and station designs for 670 km. railway
lines in Ethiopia.
|
ICONS/ OID/ Ethiopian
Railway Corporation
|
|
3
|
Pre-Bid Design Consultancy Services for Design
of Alignment
for Haul Road package & Rail package, Indonesia.
|
AFCONS Infrastructure
Ltd.
|
URBAN
PLANNING & REGIONAL PLANNING:
|
Sr.
No.
|
Project Name
|
Client
|
|
1
|
Master Plan for old Solapur Airport
|
MADC
|
|
2
|
Preparation of Draft Planning Proposal and Development
Control Rules (DCR) for Shirdi Airport
|
MADC
|
|
3
|
City Development Plan
|
Karad Municipal Council
|
|
4
|
Preparation of Detailed Project Report for Beach
facility at 25 locations.
|
MTDC
|
|
5
|
Master Plan for Tourism Development for Eco Sensitive
Zone at Mahabaleshwar.
|
MTDC
|
|
6
|
Master Plan for Tourism Development for Eco Sensitive
Zone at Matheran.
|
MTDC
|
PROJECT
MANAGEMENT SERVICES:
|
Sr.
No.
|
Project Name
|
Client
|
|
1
|
Third Party inspection and supervision consultancy
works for Sarva
Shiksha Abhiyan in Bhabhua and Sasaram districts
in Bihar.
|
Bihar Educational Project
Council (SSA)
|
|
|

|
Sarva Shiksha Abhiyan in
Bhabhua and Sasaram
districts in Bihar. (SSA)
|
|
2
|
Design and Project Management Consultancy works
for Bonkode
Flyover
|
Navi Mumbai Municipal
Corporation (NMMC)
|
3 |
Design & PMC Services
for Preparation of DPR’s, Estimates,
Tender Documents of Infrastructure Projects, including
Project
Management. |
City Municipal Council,
Hospet |
4 |
Design & PMC Services
for Preparation of DPR’s, Estimates,
Tender Documents of Infrastructure Projects, including
Project
Management. |
Town Municipal Council,
Kampli |
5 |
Construction of Two
Lane Service Road along Thane Belapur Road. |
NMMC |
6 |
Project Management
Consultancy for Construction of International
School – Karjat. |
Get Ahead Education Pvt.
Ltd. |
7 |
Development of Parking
lot for Vashi along channel |
NMMC |
RAINWATER
HARVESTING / STORM WATER:
|
Sr.
No.
|
Project Name
|
Client
|
|
1
|
Design of Detention pond in Kharghar.
|
CIDCO
|
|
2
|
Design work of flood control measures, indentifying
the type of
structure for bund/retaining wall & drawing cross
sections for Gadhi
River.
|
CIDCO
|
|
|
 |